摘要
为实现攀钢烧结机的技术升级,一台360 m2的大型烧结机于2009年6月2日建成投产,通过技术攻关与设备改进,使生产全面达到了设计水平。
To update the technological level of Panzhihua Sinter Plant, a June 2 of 2009. Through technological improvement measures and equipment machine was achieved. 300m2 sinter machine was put into operation on modification, the design capacity of this sinter