采用沉埋法修 建过江(海 )隧道已 被认为是有 显著优越 性的方法 之一,本文 重点分析、归纳近年沉管隧道施工中施工机械的选取及使用时应注 意的问题。
Applying the Sinking and burring method to built the river(sea) crossing tunnel is thought as one of the advantageous construction means.This paper emphasizes on the analysis and deduction of some remarkable problems for the chosing and utilization of the machinery applied in the sinking tube tunnel construction,which has a luminous significance.