期刊文献+

近水平煤层综放面导水裂缝带最大高度分析及其研究 被引量:2

Analysis and Study on Max Height of Water Flowing Fracture Zone in Fully Mechanized Top Coal Caving Mining Face in Horizontal Seam
下载PDF
导出
摘要 在近水平煤层条件下,利用离散元模拟的方法,分析了综放采场上覆岩层的运动特征,根据覆岩位移及应力变化规律,确定了覆岩的导水裂缝带高度。通过现场实测验证表明,数值模拟所得的裂缝带高度与实测结果相吻合,说明利用数值模拟的方法确定综放面覆岩导水裂缝带高度是可行的。 Under the horizontal seam condition,the discrete element simulation method was applied to analyze the movement features of the overburden strata above the fully mechanized top coal caving mining face.According to the displacement and stress migration law of the overburden strata,the height of the water flowing fracture zone in the overburden strata was determined.The verification of the mine site measurements showed that the fracture zone height measured with the numerical simulation was well fitted with the actual measured results and the application of the numerical simulation method could be feasible to determine the height of the water flowing fracture zone in the overburden strata above the fully mechanized top coal caving mining face.
出处 《煤炭工程》 北大核心 2011年第5期74-76,共3页 Coal Engineering
基金 山东科技大学研究生科技创新基金项目(YCA100201)
关键词 近水平煤层 综放 导水裂缝带 数值模拟 horizontal seam fully mechanized top coal caving mining water flowing fracture zone numerical simulation
  • 相关文献

参考文献4

二级参考文献10

共引文献703

同被引文献26

引证文献2

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部