摘要
介绍了桩柱式桥墩台施工中采用可调式支架浇注混凝土盖梁的方法。
This article describes the cast\|in\|place method using the adjustable height falsework in the construction of abutments and piers for the column\|support type of foundation, and emphases on the load design and the main points of construction operation.\;
出处
《内蒙古公路与运输》
1999年第3期2-3,共2页
Highways & Transportation in Inner Mongolia
关键词
可调支架
浇注
盖梁
桥梁
墩台
adjustable falsework
column\|support type of foundation
cast\|in\|place
cap beam