摘要
以宁波轨道交通1号线老桥拆复为例,介绍了轨道交通盾构施工中,为使盾构顺利掘进,需要将与盾构相碰撞的桥桩先拔除。着重介绍了桥梁拆除施工期间交通组织、老桥桩基拔除关键技术和管线迁移工程等。最后指出桥梁拆复设计中的一些关键问题。
Taking the removing and restoring of the old bridge along Ningbo Rail Transit Line 1 for example,the bridge pier colliding with the shield should be extracted in advance for the shield smooth tunneling in the field of rail transit shield construction.Several key points are introduced covering traffic organization,the key technique for old pile extracting,pipelines relocations,etc.Finally,some important problems are pointed out about the removing & restoring bridge design.
出处
《中国市政工程》
2011年第2期50-51,91,共2页
China Municipal Engineering
关键词
轨道交通
桥梁拆除
交通组织
拔桩
管线迁移
rail transit
bridges removing
traffic organization
pile extracting
pipelines relocation