为了解大埔县新汀江大桥成桥后实际承载能力是否满足设计要求,针对新汀江大桥进行静载试验。通过结构理论计算分析,确定该桥静载试验方案,阐述试验准备、实施过程及所取得效果。
In order to understand whether the new Tingjiang bridge of Dapu county after finished can satisfy the design requirement,it makes a dead load experiment.By analyzing the structural theory calculation,make sure the bridge dead load experiment plan,elaborate the experimental preparation,implementation process and the effect.
出处
《交通科技与经济》
2011年第3期22-25,共4页
Technology & Economy in Areas of Communications
关键词
新汀江大桥
静力荷载
试验分析
new Tingjiang bridge
static load