乐昌峡水利枢纽工程溢流坝泄洪消能研究 被引量:11

Flood-Releasing and Energy Dissipation of Overflow Dam at Lechangxia Water Control Project
下载PDF
导出
摘要 乐昌峡水利枢纽工程坝址处河道狭窄,溢流坝的泄洪落差和单宽流量较大,且电站尾水出水口靠近溢流坝,因此,溢流坝泄洪安全是枢纽工程的关键技术问题。通过溢流坝泄洪消能模型试验研究,对溢流坝堰面曲线、两侧收缩边墙、闸墩、挑流鼻坎等布置和体型进行了优化,改善了其运行水力特性,妥善解决了溢流坝泄洪消能防冲的问题。 This paper studies the flood-releasing and energy dissipation of the overflow dam at Lechangxia water control project which is located in a narrow river valley.The flood-releasing safety of the overflow dam therefore is a critical technical issue as it has large water head drop and the discharge per unit width of the dam is large,and moreover,the tailrace exit of the hydropower station is in the vicinity of the dam.Based on hydraulic model tests,the hydraulic property of the overflow dam is improved and hence problems of flood-releasing and energy dissipation and scour protection are solved in this paper by optimizing the layout and configuration of overflow weir and both the contracted sidewalls as well as piers and flip buckets.
出处 《长江科学院院报》 CSCD 北大核心 2011年第5期18-22,共5页 Journal of Changjiang River Scientific Research Institute
关键词 溢流坝 溢流堰 宽尾墩 差动式挑流鼻坎 消能 模型试验 乐昌峡水利枢纽工程 overflow dam overflow weir flaring gate piers differential flip bucket energy dissipation model test Lechangxia water control project
  • 相关文献

参考文献2

  • 1中华人民共和国水利部.S1319-2005,混凝土重力坝设计规范[S].北京:中国水利水电出版社,2005.
  • 2华东水利学院.水工设计手册(第6卷)[K].北京:水利电力出版社,1982.

同被引文献52

引证文献11

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部