2El - Rayes Khaled, Kandil Amr. Time - Cost - Quality trade - off analysis for highway construction [ J ] . Journal of Construction Engineering and Management, 2005,131 (4) : 477 - 486.
3Jaszkiewicz A. Genetic local search for multi - objective combinatorial optimization [ J ]. European Journal of Operational Research ,2002,137 ( 1 ) :50 - 71.
2Ahuja H M,Arunachalam V.Risk evaluation in resource allocation[J].Journal of Construction Engineering and Management,ASCE,1984,110(4):324-336.
3Padilla E M,Carr R I.Resource strategies for dynamic project management[J].Journal of Construction Engineering and Management,ASCE,1991,117(2):279 -293.
4Babu A J G,Suresh N.Project management with time,cost,and quality considerations[J].Journal of Operational Research,1996(88):320-327.
5Babu A J G,Suresh N.Project crashing:Modeling and optimization[J].WDSI Conference Proceeding,1994(3):751-755.
6Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.