Taum Sauk抽水蓄能工程系列报道(Ⅲ)——Taum Sauk上水库的重建

Report on Taum Sauk pumped storage project——rebuilding Taum Sauk
下载PDF
导出
摘要 Taum Sauk上水库重建工程主要是新建一座现代化的混凝土面对称碾压混凝土(RCC)坝来取代原有的土石坝。由于该坝是美国最大的RCC项目并采用了对称断面和相对低强度的RCC,设计中需要解决许多问题。文章总结了相关设计事项,并简要介绍了施工过程,供参考。 The Taum Sauk upper reservoir rebuild project primarily consisted of the reconstruction of the existing inoperable rock fill upper reservoir with the construction of a modern concrete faced symmetrical roller compacted concrete(RCC) dam.As the project is the largest RCC project constructed in the USA and it has asymmetrical cross-section with relatively low strength RCC,numerous design issues arose during the design process.This paper summarized these issues and introduced its construction,for reference.
作者 崔弘毅
出处 《大坝与安全》 2011年第1期67-74,共8页 Dam & Safety
关键词 TAUM Sauk上水库坝 重建 设计 施工 Taum Sauk upper reservoir dam rebuild design construction
  • 相关文献

参考文献3

  • 1P.Rizzo,J.Osterle,T.Hollenkamp and et al.The evolution of the design basis for the new upper reservoir Taum Sauk pump storage project[J].
  • 2Rebuilding Taum Sauk[J].Water power & Dam Construction,2009,1:28-32.
  • 3Ozark Constructors.Taum Sauk Upper Reservoir Rebuild Project--A Historical Achievement 2007-2010[R].