大体积混凝土基础施工与温度控制技术 被引量:1

Techology of Construction and temperature control of mass concete foundation
下载PDF
导出
摘要 安徽省新广电中心项目一期工程中的主楼筒体承台基础CT-1等厚度达3.5m,属大体积混凝土结构。为克服大体积混凝土因水化热过高产生裂缝,施工采取优化混凝土配合比、设置后浇带、斜面分层浇筑和实施混凝土浇筑后温度监测等一系列措施,成功地控制了温度和混凝土裂缝的产生,确保了该大体积混凝土基础承台的施工质量。 This article focus on the first phase of the project of AnHui Province New Broadcasting Center.The CT-1,the thickness of main cylinder based caps is 3.5m,which belongs to the Massive concrete structure.In order to overcome the crack caused by exorbitant of the hydration heat in massive concrete,the project take several measures including optimize concrete mixture,setting post-cast strip,cant layered casting,after implementing concrete pouring temperature monitoring,and so on.All these measures restrain temperature and concrete crack successfully,guarantee the construction quality of massive concrete foundation caps.
出处 《安徽建筑工业学院学报(自然科学版)》 2011年第2期54-57,共4页 Journal of Anhui Institute of Architecture(Natural Science)
关键词 大体积混凝土 基础承台 温度控制 裂缝控制 Massive concrete Foundation caps Temperature control Crack control
  • 相关文献

参考文献2

二级参考文献4

共引文献111

同被引文献16

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部