摘要 在水电基本建设各个阶段投资控制过程中,技施阶段的投资控制与工程最终成本有直接的关系。加之技施阶段参建方众多,投资控制涉及因素复杂,投资控制的难度较大,投资控制的过程,往往也是各参建各方的博弈过程。因此,技施阶段的投资控制既能展现业主投资控制的水平与能力,也在一定程度上展现了其他参加单位,尤其是施工单位的市场竞争力。结合硗碛水电站块石料场变更处理实例,浅谈一下工程建设技施阶段投资控制的实务。 During the different process of the investment control about hydroelectric capital construction,the investment control of construction has directly relations to the final cost of the project.Furthermore,as more participators and more factors,the investment control becomes more difficult during the construction,the process of investment control has become playing a game of 'go'chess also.The investment control of constuction not only displays the abillity of project owner,but the market competitive of other participators,especialy to the contractors.Here from the example of resolving the changing about rock stock ground of the QiaoQi Power Station,simply taking about the practice about the investment control of hydroelectric capital construction during the construction.
作者 杨靖 梁川
出处 《水利科技与经济》 2011年第5期41-43,共3页 Water Conservancy Science and Technology and Economy
关键词 水电基本建设 投资控制 工程成本 变更 硗碛水电站 hydroelectric capital construction investment control cost of the project changing QiaoQi Power Station
  • 相关文献

同被引文献10

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部