摘要
介绍了高摩赞大坝溢洪道抗冲耐磨混凝土施工方案、施工工艺和施工中应注意的事项,通过该施工方案应用后在施工质量、施工进度和施工成本方面所表现出来的优越性,得出溢洪道抗冲耐磨混凝土与大坝大体积混凝土同步进行浇筑的施工方案值得广泛应用的结论。
Construction scheme,construction workmanship and working procdures to be cared during construction about the construction of anti-erosion concrete of spillway are presented,according to the advantages on construction quality,construction progress and construction cost after applying this construction scheme,the conclusion that the construction scheme on the construction of anti-erosion concrete of spillway to be carried out as well as the construction of dam concrete shall be applied widely is drawn.
出处
《水利科技与经济》
2011年第5期93-95,共3页
Water Conservancy Science and Technology and Economy