摘要 以鹤壁万和发电有限责任公司1、2号机组运行过程为例,根据可靠性指标的变化,找出影响等效可用系数的原因,指出提高设备制造和安装质量,认真做好新机组的首次计划检修,加强运行、检修人员的培养和燃料管理,提高机组等效可用系数,是加速新机稳定的有效途径。 With the example of the No1 and 2 generation units of the Hebi Wanhe Generation Co. Ltd,and according to the variation of the reliability index,find out the cause which influence equivalent usability factor. Point out the effective way to promote the new generation unit stability is to improve the quality of the equipment manufacturing and installation, conscientiously deal with the first planned overhaul of the new generation unit,enhance the fuel management and the training of the operation and overhaul personnel.
作者 刘亚平
出处 《华中电力》 1999年第2期31-34,共4页 Central China Electric Power
关键词 发电设备 运行 可靠性 发电厂 Generation Equipment, Operation Reliability, Equivalent Usability Factor, Statistics Analysis

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部