摘要
隔河岩水电厂根据设备及运行方式实际状况,进行了设备改造(改进),顺利实现了无人值班(少人值守),是我国第4座通过国家电力公司“无人值班”正式验收的水电厂。
Based on the practical status of operation mode of Geheyan Hydropower Station,Power facilities are improved which results in unattended operation.Tins is the 4th hydropower station passing the unattended operation acceptance inspection by the National ElectricPower Company.
出处
《华中电力》
1999年第2期39-41,共3页
Central China Electric Power
关键词
水电厂
机电设备
设备改造
Hydraulic Power, Plant Retrofit of Facilities,Unattended Operatin