摘要
三峡电站给湖北工业发展提供了充足的能源,但负荷的发展是渐变的,一个电网对电能的接纳能力不是没有限制的,客观地说,三峡电站及湖北电网的特点,使得湖北电网接纳三峡电能受到一定限制,因此我们应正视三峡大量供电可能给湖北电网带来的问题,切实做好前期工作,以提高湖北电网接纳三峡电能的能力。
Three Gorges weter conserancy centre projet is a worldwide famous huge project which has great multi benefit for flood prevention,power generation,shipping ,etc.This project provides enough energy to develop hubei.industry however But,the load development is changing gradually and the power acceptability of a network and Hubei network is not unlimited.According to the characteristics of Three Gorges power station.We should pay attention to the problems caused by large energy supply from Three Gorges and complet the proceding work to improve the power acceptance ability from Three Gorges.
出处
《湖北电力》
1999年第3期1-4,共4页
Hubei Electric Power
关键词
三峡电站
湖北
电网
电力系统规划
three gorges power station
hubei network
power acceptance
stability
countermeasure