直升机在连续档牵放导引绳施工中的受力计算 被引量:1

The Calculation of Tension Towing a Helicopter in Stringing Engineering during Releasing the Leading string between Continual Span Poles
下载PDF
导出
摘要 根据直升机架线施工的经验,就直升机牵放导引绳施工较为关键的直升机受力、控制档张力、张力机出口受力等计算作了介绍。该计算方法可供特大山区500 kV架线、三峡外送工程等利用直升机施工时参考。 The overall electric transmission engineering from the “Three Gauge” project will be started up soon.It is quite possible that the helicopter will be adopted for the construction of the 500 kV transmission lines in the special mountainous area.As a reference according to our engineering experiences,this article described and introduced the key calculations of the forces applied to the helicopter and the tension control between the spans of the poles and the force on the outlet of the tension machine under the situation where the helicopter releasing the leading string.
作者 李强
出处 《湖北电力》 1999年第3期26-28,共3页 Hubei Electric Power
关键词 架线 施工 受力分析 直升机 导引绳 helicopter string engineering tension analysis
  • 相关文献

同被引文献7

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部