对500 kV变电所2 种安装形式的电容式电压互感器 (以下简称CVT) 不拆线预试进行了分析, 特别对线路侧CVT不拆线对测试的影响作了探讨。
This paper analyzes the preventive test of two installations of capacitive voltage transformers (CVT) in 500 kV substation.It also analyzes the impact to the test results without disconnecting the high tension leads,especially for the CVT installed on the line side.
出处
《河北电力技术》
1999年第5期8-11,共4页
Hebei Electric Power
关键词
CVT
预试方法
电压互感器
高压引线
变电所
kV CVT without disconnecting high tension leads method of preventive test test and measurement