摘要
对谏壁电厂为消除 1 000 t/h U P型双炉膛直流锅炉爆漏而进行的改造作了介绍,其中就热力参数的衔接、取消双面水冷壁对燃烧及炉内热负荷分布的影响等几个技术问题的解决作了论述。
The retrofit of Jianbi Power Plant's 1 000 t/h UP duel furnace once through boiler due to boiler tube failure is described,in which several key problems such as parameter matching before and after retrofit,the effect of duel face waterwall elimination on furnace heat flux distribution are detailed.
出处
《华东电力》
1999年第9期19-21,共3页
East China Electric Power
关键词
直流锅炉
燃烧器
UP型
技术改造
double furnance once through boiler boiler tube failure furnace hot and cold corner burner