油气田大修理项目费用控制探索——以某35kV变电站大修工程为例

Research on Overhaul Project Cost Control in Oil and Gas Fields-Case Study of an Power Input Wires Overhaul Project in a 35KV Transformer Station
下载PDF
导出
摘要 针对如何合理确定并有效控制油气田大修理项目费用的问题,以某35kV变电站电源进线大修工程为例,介绍了事前成立项目管理机构及确保设计概算准确、事中加强施工方案动态管理及重视工程量现场签证管理、事后加强工程余料管理以及采购环节加强物资采购管理以控制设备及材料采购费用的全过程费用控制方法,最终使此项目节约投资47.72万元,节约率为9.4%。 As for the problem of how to make rational determination and effective control on overhaul project costs in oil and gas fields, an overhaul project on power input wires in a 35kV transformer station has been taken as an example to discuss. In this case, the whole-process cost control method including establishing a project management agency which can ensure the accuracy of preliminary estimate before the event, strengthening construction plan dynamic management and on-site quantity visa management during the event and enhancing remants management and material purchasing management to control the purchase costs of equipments and materials after the event is introduced. Under these cost control measures, total investment of project has been cut by 9.4 %, or RMB 477,200.
出处 《天然气技术与经济》 2011年第2期74-76,80,共3页 Natural Gas Technology and Economy
关键词 油气田 工程项目 费用控制 大修理 oil and gas fields, engineering project, cost control, overhaul
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部