摘要
介绍了博山3# 隧道运用减载反压技术处理浅埋偏压问题的情况,并对减载。
The technology of downloading counter pressure employed to deal with short seated and uneven pressure in Boshan tunnel 3 was mentioned, and the working procedure control in downloading and counter pressure construction was also discussed.
出处
《兰州铁道学院学报》
1999年第3期44-48,共5页
Journal of Lanzhou Railway University
关键词
浅埋偏压隧道
减载反压技术
施工
公路隧道
short seated and uneven pressure tunnel
downloading and counter pressure technology downloading construction in border brae
counter pressure and concretion technology