乌江P-F-C吊拉组合桥施工工艺研究 被引量:1

The construction method research of the Wujiang P F C cable stayed and suspension cambination bridge
下载PDF
导出
摘要 笔者介绍乌江P-F-C 吊拉组合桥采用缆吊平台替代猫道架设主缆、100 t 箱梁缆吊悬拼工艺及斜拉桥拉索分束张拉等一系列施工新工艺, 可供同行专家和工程技术人员参考. Wujiang Cable stayed and Suspension Combination Bridge is a new type of bridge which combines cable stayed bridge and suspension bridge together,and it is also the first bridge of this type in the world.To build the bridge,some new ideas were brought forth in the design of the bridge,and new materials and technology were abopted.The article has intruduced the construction method of using cable platform instead of cate way,erecting 100 tons of box girder with cableway and cantilever assmblage,tensioning the stays of the cable stayed bridge by different times.
作者 刘东 蒙云
出处 《重庆交通学院学报》 1999年第4期96-102,共7页 Journal of Chongqing Jiaotong University
基金 交通部"八五"科技联合攻关项目
关键词 吊拉组合桥 施工工艺 主缆架设 缆吊悬拼 分束张拉 cable stayed and suspension combination bridge construction method building the main cable erection with cableway and cantilever erection tension by different times
  • 相关文献

参考文献2

  • 1蒙云.大跨径P.F.C吊拉组合桥设计探讨.中国会路学会97学术交流论文集[M].,1997..
  • 2乌江P.F.C吊拉组合桥设计与施工工艺研究课题组.《乌江P.F.C吊拉组合桥设计与施工工艺研究》研究报告[M].重庆:重庆交通学院,1998..