新建火电机组启动初期凝结水水质较差,不符合回收条件。为能既及早回收凝结水,又避免进口树脂受到污染,提出了在机组启动初期用国产阳树脂代替进口阴树脂的运行方式。此方式在丰城电厂1、2、3号机组整套启动初期得以应用,取得了良好的效果。
In initial start-up stage of a new unit in power plant,the condensate water is unfit for recycle condition because of its worse water quality.In order to recycle condensate water as soon as possible,and to avoid contaminating imported resin, an operation mode which use domestic canon resin instead of imported anionresin is put forward in this paper.An excellent effect had been obtained when this mode was applied in Nol. 2.3 Units of Fengcheng Power Plant