期刊文献+

基于最佳并行度的任务依赖图调度 被引量:7

Optimum Degree of Parallelism-based Task Dependence Graph Scheduling Scheme
下载PDF
导出
摘要 基于最佳并行度的任务依赖图调度策略充分利用编译时刻所得到的全局信息,采用横向和纵向任务合并,处理节点预分配,静态调度和动态调度相结合、集中式调度和分层调度相结合等措施,是一种简单的、具有较高效率的实用化调度方案.该调度方案能够在尽量压缩调度长度的情况下节约系统资源. Optimum degree of parallelism-based task dependence graph scheduling scheme fully utilizes theglobal information collected at compile-time, employs the techniques such as task merging in horizontal andvertical directions, processors pre-allocation, combination of static and dynamic scheduling, and integration ofcentralized scheduling and layer-scheduling. It is a simple, practical and effective scheduling method whichaddresses the problem of how to both reduce the execution time of programs and economize on processorresources.
出处 《软件学报》 EI CSCD 北大核心 1999年第10期1038-1046,共9页 Journal of Software
基金 国家863高科技项目基金
关键词 任务依赖图 静态调度 动态调度 NP问题 程序设计 Hierarchical task graph, task dependence graph, static scheduling, dynamic scheduling, optimumdegree of parallelism.
  • 相关文献

参考文献2

  • 1Liu Y A,Technical Report TR508 Indiana University,1998年
  • 2Wang Q,Inform Process Lett,1991年,37卷,5期,78页

同被引文献113

引证文献7

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部