摘要 矿区GPS控制网在数据处理过程中,经过了高斯投影必定产生高斯投影变形和高程面归算变形。基于相山铀矿田的GPS网建网工程实例,结合矿区施工控制网的高斯投影变形理论和矿区施工测量的特点,分析其原因及变形程度,对其边长改化具体方法进行比较分析,选择最佳方法对其变换,达到提高矿区平面控制网精度的目的。 In the data processing of mining GPS control network,there must be Gauss projection distortion and deformation of surface elevation imputed since after Gauss Projection.Based on the GPS network building practice of Xiangshan uranium mine area,combining with the theory of Gauss projection distortion and the characteristics of construction survey in mining control network,analyzing the causes and deformation degree,this paper makes a comparative analysis of some specific methods of minimizing the scale error,and selects the optimal method to do a transformation of coordinates,in order to improve the accuracy of the mining horizontal control network.
出处 《江西科学》 2011年第2期197-199,215,共4页 Jiangxi Science
基金 核资源与环境省部共建国家重点实验室资助项目(101115)
关键词 GPS 投影变形 长度变形 尺度强制约束 GPS Projection distortion Scale distortion Seale forced restraint
  • 相关文献

参考文献6

二级参考文献19

共引文献51

同被引文献26

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部