摘要 爱河流域有丰富的水能资源,水能蕴藏量25万kW,目前开发利用程度低,急待进一步开发。拟建水电站工程等别的准确确定对工程投资、库区淹没、经济效益都会产生决定性的影响。该文首先阐述了爱河流域水能开发的现状及其规划目标,接着分析了水能开发上存在的问题,最后提出了水电站工程等别确定的若干依据。 There is the abundant waterpower resource in Aihe River with 25000-kw waterpower reserves.The development utilization level is low now and it is urgently to be developed further.The correct determination of the engineering level of the proposed hydropower station will produce the definitive effect on the engineering investment,reservoir area flooding and economical benefit.The article firstly sets forth the present situation of the waterpower development and its planning design of Aihe River,then analyzes the problems existing in the waterpower development,and finally puts forward some basis to determine the engineering level of hydropower station.
作者 许聪 姜丽娜
出处 《城市道桥与防洪》 2011年第4期112-113,8,共2页 Urban Roads Bridges & Flood Control
关键词 爱河流域 拟建水电站 工程等别 确定依据 Aihe River,proposed hydropower station,engineering level,determination basis
  • 相关文献

参考文献1

  • 1SL252-2000.水利水电工程等级划分及洪水标准[S].[S].,..

共引文献158

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部