悬臂浇注连续箱梁施工过程控制 被引量:1

Construction Process Control of Cantilever Pouring Continuous Box Girder
下载PDF
导出
摘要 该文结合某铁路特大桥40.7 m+60 m+40.7 m预应力混凝土连续箱梁施工过程控制实践,详细介绍了施工阶段各截面预拱度的设置、立模标高的计算以及控制截面的应变测试,确保了该桥的顺利合龙及施工安全,可为类似桥梁的施工过程监控提供参考。 According to the construction process control of 40.7 m+60 m+40.7 m pre-stressed concrete continuous box girder for an overlarge railway bridge,the article introduces in detail the setting of various section cambers,the calculation of template elevation and the strain test for controlling the sections in the construction stage,which ensures the smooth closure and the construction safety of this bridge,and can provide the reference for the construction process monitor and control of the similar bridges.
出处 《城市道桥与防洪》 2011年第4期127-131,7,共5页 Urban Roads Bridges & Flood Control
关键词 悬臂浇注 施工过程控制 预拱度 立模标高 应力测试 误差分析 cantilever pouring,construction process control,camber,template elevation,strain test,error analysis
  • 相关文献

参考文献3

二级参考文献8

共引文献37

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部