摘要 为了验证岭澳核电站二期工程国内自主设计的反应堆控制系统与其他引进数字化仪控平台的匹配性,进行了反应堆功率和温度控制系统试验、稳压器压力水位控制系统试验、蒸发器水位控制系统试验。试验结果表明:反应堆控制系统的设计与其数字化仪控系统是相适应的,其控制逻辑组态符合功能设计要求,各控制系统经参数优化投自动后运行稳定,抗扰动能力良好,其调节参数和性能指标能满足机组瞬态工况下各项运行验收准则要求。 In order to verify the adaptability between reactor control(RRC) system independently designed in China in phaseⅡ project of Lingao power station and introduced digital instrumentation and control platform,tests on reactor power and temperature control system,pressure and water level control system of stabilizer as well as water level control system of evaporator are conducted.The test result shows that design of control system of the reactor is adapted to digital instrumentation and control system,and the configuration of control logic accords with function design requirements;each control system operates steadily after parameter optimization and putting into automation,and obtains favorable anti-disturbance ability,the regulating parameter and performance index can meet the requirement of operation acceptance rules under various working conditions.
出处 《广东电力》 2011年第4期34-38,共5页 Guangdong Electric Power
关键词 核电站 反应堆控制系统 数字化仪控系统 参数优化 瞬态 启动调试 nuclear power station RRC DCS parameter optimization transient state start-up commissioning
  • 相关文献

参考文献3

二级参考文献5

共引文献23

同被引文献28

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部