摘要
根据挤压车间淬火井沉井施工过程,对沉井施工工艺进行了总结,并针对沉井下沉过程中可能出现的问题作了分析,同时给出了应对措施,取得了良好的施工效果。
According to quenching wells open caisson subsiding in extrusion workshop, it outlines the open caisson construction technology, analyzes problems possibly occurring in open caisson subsiding, and shows countermeasures, and achieves good construction effect.
出处
《山西建筑》
2011年第16期103-104,共2页
Shanxi Architecture
关键词
沉井
下沉
施工控制
open caisson, subside, construction control