摘要
通过工程实例简要介绍了现浇预应力混凝土连续箱梁各工序施工技术及质量控制重点,同时提出在施工过程中应严格控制施工质量,发现问题及时分析和总结原因,抓住重点环节,以保证现浇预应力混凝土连续箱梁施工质量。
Through engineering case, it briefly introduces the cast-in-situ prestressed concrete continuous box girder construction technology and quality control points, and holds that the construction quality should be strictly controlled in the construction process, problems should be timely analyzed, causes should be summarized, and the critical points should be tightly grasped, so as to guarantee the cast-in-sire prestressed concrete continuous box girder construction quality.
出处
《山西建筑》
2011年第16期128-130,共3页
Shanxi Architecture
关键词
现浇预应力箱梁
施工技术
质量控制
cast-in-situ prestressed box girder, construction technology, quality control