以宁德至武夷山高速公路宁德段大坑大桥(66 m+120 m+66 m预应力混凝土变截面箱梁连续刚构)为背景,介绍了该桥施工过程仿真计算的要点和施工控制内容、监测内容和方法,为类似的连续刚构桥施工控制提供了指导。
Take the Ningde to Wuyishan highway Ningde section hole bridge(66 m + 120 m + 66m prestressed concrete variable cross-section box girder continuous rigid-framed) as background, this paper introduced the bridge construction process simulation calculation points, the construction control content, monitoring content and method. For similar continuous steel structure bridge construction control provided guidance.
出处
《山西建筑》
2011年第16期190-191,共2页
Shanxi Architecture
关键词
连续刚构
施工控制
仿真计算
结构分析
continuous rigid-framed, construction control, simulation calculation, structure analysis