考虑不确定因素的单件小批作业计划与调度动态算法 被引量:7

A Job-shop dynamic scheduling algorithm developed by considering uncertain factors
下载PDF
导出
摘要 针对单件小批企业在实际生产中存在订单变更和生产现场变化等不确定性因素,导致生产作业的执行与计划存在偏差的问题,提出了一种考虑不确定因素的作业计划与调度动态算法.算法以加工周期最短为目标,对作业计划与调度的变更问题进行求解,通过缩短最长加工路径上的各工序等待时间来缩短加工周期,以调整作业计划,使其适应实际作业调度的需要.通过实例研究,应用该算法进行作业计划的动态调整,能够满足作业计划变更的需求,达到变更目标. In considering the problem of the deviation between production execution and production planning caused by an uncertain factor in actual single piece and small batch production,a Job-shop dynamic scheduling algorithm developed by considering uncertain factors was proposed.The algorithm could solve the production planning and scheduling change problem with a cost function of minimum Makespan.The algorithm realized the objective of shortening the Makespan by shortening the waiting time of the processes in the longest path;then the new production planning was able to meet the actual scheduling need.The ability of the algorithm was verified through two examples;it met the scheduling change demand and reached the change goal.The algorithm is feasible and effective.
出处 《哈尔滨工程大学学报》 EI CAS CSCD 北大核心 2011年第4期471-475,共5页 Journal of Harbin Engineering University
关键词 动态算法 作业计划变更 不确定因素 Job-shop scheduling dynamic algorithm uncertain factor
  • 相关文献

参考文献13

  • 1XU Kailiang, FENG Zuren, KE Liangjun. A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates [ J ]. Annals of Operations Research, 2010, 181 ( 1 ) :303-324.
  • 2VAHID R, AKRAM K, MIR M, BEHANM V. A mixed-integer linear programming model along with an electromagnetism-like algorithm for scheduling job shop production system with sequence-dependent set-up times[ J]. The International Journal of Advanced Manufacturing Technology, 2010, 47 (5) :783-793.
  • 3YANG Shengxiang, WANG Dingwei, CHAI Tianyou, KENDALL G. An improved constraint satisfaction adaptive neural network for job-shop scheduling [ J ]. Journal of Scheduling, 2010, 13(1) :17-38.
  • 4ESWARAMURTHY V, TAMILARASI A. Hybridizing tabu search with ant colony optimization for solving job shop scheduling problems [ J ]. The International Journal of Advanced Manufacturing Technology, 2009, 40 ( 9 ) 1004- 1015.
  • 5HUANG Ronghwa, YANG Changlin. Ant colony system for job shop scheduling with time windows[J]. The International Journal of Advanced Manufacturing Technology, 2008, 39(1-2) :151-157.
  • 6CAMINO R, RAMIRO V, MIGUEL A. Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times [ J ]. Journal of Heuristics, 2010, 16(2) :139-165.
  • 7GHOLAMI M, ZANDIEH M. Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop [ J ]. Journal of Intelligent Manufacturing, 2009, 20 ( 4 ) : 481- 498.
  • 8MEHMET E, MEHMET S. Sequential and parallel variable neighborhood search algorithms for job shop scheduling[J]. Studies in Computational Intelligence, 2008, 128:5-144.
  • 9FARDIN A, MEHDI G, SEYYED M. Application of chance-constrained programming for stochastic group shop scheduling problem [ J ]. The International Journal of Advanced Manufacturing Technology, 2009, 42 ( 3 ) : 321- 334.
  • 10SEYDA T, GAMZE K. A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization [ J ]. The International Journal of Advanced Manufacturing Technology, 2009, 44 (7) : 781- 794.

二级参考文献12

  • 1黄明,梁旭.一种新型病毒进化遗传算法研究[J].计算机集成制造系统,2005,11(8):1138-1141. 被引量:3
  • 2范丹丹,曾立英,方建安,王直杰.混流车间调度问题的多对染色体遗传算法求解[J].计算机仿真,2006,23(2):157-160. 被引量:3
  • 3Akyol D E, Bayhan G M. A Review on Evolution of Production Scheduling with Neural Networks[J]. Computers and Industrial Engineering, 2007, 53(1): 95-122.
  • 4Li Maojun, Tong Tiaosheng, Luo Longfu. Partheno-genetic Algorithm and Its Application[J]. Journal of Hunan University, 1998, 25(6): 56-59.
  • 5刘敏,严隽薇.基于自适应退火遗传算法的车间日作业计划调度方法[J].计算机学报,2007,30(7):1164-1172. 被引量:19
  • 6王凌.车间调度及遗传算法[M].北京:清华大学出版社,2003..
  • 7AKYOL Derya Eren, BAYHAN G Mirac. A review on evolution of production scheduling with neural networks [ J ]. Computers and Industrial Engineering, 2007, 53 ( 1 ) :95 - 122.
  • 8ZHANG Chaoyong, LI Peigen, GUAN Zailin, et al. A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem [ J ]. Computers and Operations Research, 2007, 34( 11 ) :3229 - 3242.
  • 9HUANG Ronghwa, YANG Changlin. Ant colony system for job shop scheduling with time windows[ J]. The Intermational Journal of Advanced Manufacturing Technology, 2007, ( 9 ) : 2010 - 2018.
  • 10ZHANG H F, LI X P, ZHOU P. A Job shop oriented virus genetic algorithm[ C ]. Hangzhou:Fifih World Congress on Intelligent Control and Automation. Conference proceedings,2004:2132- 2136.

共引文献13

同被引文献77

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部