摘要
郓城煤矿在副井井筒深部含水层施工过程中采取多种措施,防止了止浆垫上浮破坏、井壁被注浆破坏等事故的发生,保证了井筒井壁和探水预注浆施工的安全,取得了很好的注浆效果。
In the coal mine auxiliary shaft well chamber depth portion water-bearing stratum construction,takes many kinds of measures in the construction process,has not occurred stops the thick liquid to fill up floats the destruction,the wall to pour accidents and so on thick liquid destruction,had guaranteed the well chamber wall and searches Shui Yuzhu the thick liquid construction the security,has made the very good note thick liquid progress.
出处
《山东煤炭科技》
2011年第2期12-13,共2页
Shandong Coal Science and Technology
关键词
深立井
含水层
注浆
The deep vertical shaft the water-bearing stratum pours the thick liquid