大比例尺地形图测绘项目的集成管理研究 被引量:2

A research on integrated management in large-scale topographic mapping
原文传递
导出
摘要 本文应用项目集成管理的方法,研究大比例尺地形图测绘过程中如何提高整体效益的问题:结合大比例尺地形图测绘的特点,不但建立测绘项目的成本、工期、质量三要素集成网络计划模型,引入遗传算法对模型进行优化求解,并且对测绘项目风险进行预测,探索了一种兼顾成本、工期、质量和风险四个要素的测绘项目集成管理方法。风险因素与其他三要素的集成将大大提高测绘项目集成管理的现实意义。 This paper explored the application of the integrated project management approach to large-scale topographic mapping in order to improve the overall efficiency.Based on the characteristics of the large-scale topographic mapping,the paper built a network planning model which combines the cost,schedule and quality of surveying and mapping project.Genetic algorithm was introduced to solve the optimization problem of the integrated network model.With project risk assessed by BP Neural Network,the paper proposed an integrated project management approach in which such factors as cost,schedule,quality and risks were taken into full consideration.The integration of risk factors into the other three elements had practical significance in integrated mapping project management.
作者 吴晓红
出处 《测绘科学》 CSCD 北大核心 2011年第3期241-243,共3页 Science of Surveying and Mapping
基金 唐山市科学技术局科研项目(09110229c)
关键词 地形图测绘 集成管理 网络计划技术 遗传算法 神经网络 topographic mapping integrated management network planning technique genetic algorithm BP neural network
  • 相关文献

参考文献8

二级参考文献13

  • 1卢基亚诺夫.工程测量精度估算[M].北京:测绘出版社,1985..
  • 2CJJ8-99.城市测量规范[S].[S].,1999..
  • 3Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Committee, 2000.
  • 4Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC, Chicago, Illinois: Probus Publishing Company, 1992.
  • 5Navy, Special Projects Office, Bureau of Ordnance, Department of the Nevy, Project PERT, Washington DC. 1958.
  • 6NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/COST, Washington, DC. 1962.
  • 7Fleming, Quentin W., and Joel M Koppelman, "Earned Value Project Management", Cost Engineering, Vol.39, No.2, Feberary, 1997.
  • 8Abba, Wanyne Y., "Earned Value Management—Reconciling Government and Commercial Practices: For People Involved in Earned Value—Government, Industry, Academic, or Consulting—These Are Exciting Times", PM: Special Issue, January-February, 1997.
  • 9Fleming, Quentin W., and Joel M. Koppelman, "Earned Value Project Management—A Powerful Tool for Software Projects" Crosstalk the Jounal of Deffence Software Engineering, July 1998.
  • 10Cass, Donald J., "Earned Value Program for DOE Projects", AACE-Ⅰ TRansactions-1998, 1998.

共引文献139

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部