摘要
岩土工程勘察一直是核电厂前期工作的一个重要内容,而岩土工程勘察评价的结果直接关系到核电厂址的成立与否以及优劣排序。本文结合华东电力设计院多年核电工程的具体实例,重点叙述了勘察方案的确定、勘察工作量和主要成果内容,对核电前期各阶段所需要重点解决的问题和评价的方法作了总结说明,并提出了对当前工作的一些体会,希望藉此与广大核电同行进行经验交流。
Investigation of geotechnical engineering is always important content in Early Stage of Nuclear Power Plants,and the result of evaluation will decide direct whether the site of nuclear power plant is feasible and its order.This article combine long-term nuclear power example of East China Electric Power Design Institute,narrate mostly the facts that program and workload and production of investigation,summarize the problems need to settle first and the evaluation methods,finally,it bring forward some experience in currently work,and communion in confrere is expected.
出处
《电力勘测设计》
2011年第2期14-18,26,共6页
Electric Power Survey & Design
关键词
岩土工程勘察
核电厂
勘察方案
勘察工作量
investigation of geotechnical engineering
nuclear power plant
investigation program
investigation workload