摘要 水利枢纽改造工程中爆破拆除是常用的施工方式,爆破拆除施工中势必会对附近已有建筑物及重要保护设施带来一定影响。本文论述了水丰水电站副坝爆破拆除中,振动测试手段对重要设施及建筑物的安全影响,并围绕爆破振动可能造成的影响提出了具体的方案和措施。 The blasting demolition is the common construction method for the hydro-junction reconstruction project.The method would make an impact on the near existing buildings and important protection facilities.The paper discusses the influence of vibration test method on the security of important buildings and facilities in blasting demolition of auxiliary dam of Shuifeng hydropower station,and puts forward the actual scheme and measures for the possible influence of the blasting vibration.
出处 《东北水利水电》 2011年第5期3-5,71,共3页 Water Resources & Hydropower of Northeast China
关键词 爆破拆除 振动测试 影响分析 水丰水电站 blasting demolition vibration test influence analysis Shuifeng hydropower station
  • 相关文献

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部