摘要
本文阐述了焦港船闸三角门顶底枢、拉杆安装测量控制的具体做法,探讨利用全站仪、垂球、钢尺在顶底枢同轴虚拟线施测过程中的运用。
This paper focused on the top and the bottom pintle installations of Jiao Port Triangular Floodgate.And the applications of total station,plumb as well as steel ruler were discussed in the coaxial imaginary line survey of the pintles.
出处
《现代测绘》
2011年第1期47-48,共2页
Modern Surveying and Mapping
关键词
船闸
三角闸门
安装测量
floodgate
triangular lock gate
installation survey