基于未确知测度理论的CCPM缓冲区尺寸设计 被引量:3

Buffer size designing of critical chain project management based on unascertained measure theory
下载PDF
导出
摘要 从工程项目的工序风险偏好程度、执行时间不确定性程度、复杂性程度和开工柔性程度4种特性入手,建立工序特性对缓冲区尺寸影响程度指标体系。引入未确知测度理论,计算工序特性对缓冲区尺寸影响程度的综合测度向量,利用工序特性对缓冲区尺寸的中等影响程度进行定性判断,并进一步采用置信度识别准则定量确定缓冲区尺寸。算例结果表明,工序A~Z的缓冲区影响因子在[0.177,0.804]范围内,工序消耗缓冲区尺寸的影响因子会随着工序特性而合理调整,从而验证了该设计模型的可行性。 The influence index system of process characteristics to buffer size was built from the following 4 aspects: the process risk preference,the execution time uncertainty,the complexity and the starting flexibility.The unascertained measurement theory was introduced to calculate the comprehensive measure vector of process characteristics to buffer size influence.Then the buffer size was qualitatively decide according to the moderate influence of process characteristics and quantitative calculated by confidence identifying criterion.Examples show that the influence factors of buffer fall in [0.177,0.804] from process A to Z,and the influence factors consumed will be rationally readjusted with process characteristics,which verifys the validity of this approach.
作者 王晓波
出处 《河北工程大学学报(自然科学版)》 CAS 2011年第1期76-80,共5页 Journal of Hebei University of Engineering:Natural Science Edition
关键词 未确知测度 关键链项目管理 缓冲区尺寸 unascertained measure critical chain project management buffer size
  • 相关文献

参考文献6

二级参考文献57

共引文献193

同被引文献21

  • 1李万庆,张立宁,孟文清.基于信息熵与未确知测度的MIS综合评价模型研究[J].河北建筑科技学院学报,2005,22(1):49-53. 被引量:6
  • 2牛丽文,夏冬艳,任丽媛.基于未确知测度的企业业绩评价模型研究[J].河北建筑科技学院学报,2006,23(3):91-94. 被引量:3
  • 3GOLDRATT E M.Critical chain[M].NY:North RiverPress,1997.
  • 4LEACH L P.Critical chain project management[M].London:Artech House Inc.,2000.
  • 5RABBANI M,FATEMI GHOMI S M T,JOLAI F,et al.A new heuristic for resource-constrained project schedu-ling in stochastic networks using critical chain concept[J].European Journal of Operational Research,2007,176(2):794-808.
  • 6LONG D L,OHSATO A.Fuzzy critical chain method forproject scheduling under resource constraints and uncer-tainty[J].International Journal of Project Management,2007,9:1-11.
  • 7吴茂森.概率与信息[M].上海:科学技术出版社.1960.
  • 8COLDRATTEM.Critical Chain[M].New York:The North River Press,1997.
  • 9STEYN H.Project management applications of the theory of constraints beyond critical chain scheduling[J].International Journal of Project Management,2002 (20):75-80.
  • 10郭庆军,赛云秀.关键链多项目进度管理分析[J].西安工业大学学报,2007,27(6):583-587. 被引量:15

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部