摘要
给排水工程中,对埋深较大而横截面尺寸相对不大的构筑物,采用大开槽施工将会造成占地面积大、土方量多等弊病,有时还受到施工场地限制。为此,常采用沉井法施工。沉井法适用于高地下水位、土质松软、流砂地段以及现场狭窄地段修建深埋构筑物。本文中沉井体积大,故采取先开挖再采用砂垫层很上铺承垫木扩大刃脚的施工技术。
In the water supply and drainage engineering project, for the large of buried depth cross-sectional size relatively modest structures, if we adopt large notching construction it will cause a lot of disadvantage, such as cover more area, make laege earth volume, it also will be astricted by the construction plant. For the above reasons, we shall adopt well-sinking construction mathod, this mathod can be act applied to high ground water, soil soft, flow sand area and on-site narrow area buried structures built. In this paper, so take caisson volume by again fjrst excavation pile sand pad is spread of wood expand blade mat feet construction technique.
出处
《科技信息》
2011年第11期269-270,共2页
Science & Technology Information
关键词
沉井
砂垫层
承垫木
泵站
软土地基
Caisson
Bearing
Skids
Pumping
Soft sand cushion