摘要
为了减轻劳动强度,减少工装费用和工时费用,对原来装镶铸石管道工艺进行创新改进,克服了原来装镶铸石管道工艺效率低、费用高等缺点,往钢管中装镶铸石管由立式工艺方法改进为卧式工艺方法。年可节省资金36.8万元,同时在节能、节材及成本方面,具有推广价值。
In order to reduce the labor intensity,reduces the work clothes expense and a man-hour of expense,inlays the cast stone pipeline craft to the original attire to make the innovation improvement,overcame the original attire to inlay the cast stone pipeline craft efficiency to be low,the expense higher shortcoming,inlaid the cast stone tube toward the steel pipe Chinese dress to improve by the vertical technique for the horizontal type technique.The year may save the fund 368,000 Yuan,simultaneously in the energy conservation,the nodal wood and the cost aspect,has the promoted value.
出处
《中国建材科技》
2011年第2期37-39,共3页
China Building Materials Science & Technology
关键词
铸石
铸石复合管工艺
木块
工艺改进
cast stone
cast stone composite pipe technology
wood
Process Improvement