摘要 ±800kV特高压直流线路工程中采用的耐张转角塔具有高、重、横担长特点,在现场特殊环境条件下,常规施工方法无法完成耐张塔边横担吊装。介绍了采用内悬浮主抱杆配合塔上人字抱杆顺利完成吊装边横担的特殊施工技术。 The tension towers used in±800 kV ultra-high voltage transmission line,tall and heavy,have long cross arms. As a result of the special environment in the field installation,it is difficult to hoist the edge cross arms of tension tower by conventional methods.Therefore,a special construction method is provided to hoist the edge cross arms successfully that the main gin pole suspended in inner tower is assisted by the herringbone pole.
出处 《电力建设》 2011年第5期114-117,共4页 Electric Power Construction
关键词 特高压 耐张塔 特殊环境 边横担 吊装 ultra-high voltage tension tower special environment edge part of the cross arm hoisting
  • 相关文献

参考文献3

  • 1李博之.高压架空输电线路施工技术手册杆塔组立计算部分[M].2版.北京:中国电力出版社,1997.
  • 2国家电网公司.Q/GDW 262-2009±800 kV架空输电线路铁塔组立施工工艺导则[S].北京:国家电网公司,2009.
  • 3潘雪荣.高压送电线路杆塔施工[M].北京:中国电力出版社,1996.