观音岩水电站右岸碾压混凝土斜层施工工艺

Inclined layer construction technology for RCC placement on right bank of Guanyinyan Hydropower Station
下载PDF
导出
摘要 本文主要介绍了观音岩水电站右岸碾压混凝土斜层施工工艺、工艺流程及经济性分析,阐述了施工中斜层面上骨料分离及坡脚处骨料集中等问题的处理方法。 The inclined layer construction technology, process flow and economy of the roller-compacted concrete (RCC) on the right bank of Guanyinyan Hydropower Station are mainly described herein, and then the treatment methods for the problems such as aggregate separation on the surface of the inclined layer and the aggregate concentration at the toe of the slope during the construction are explained as well.
出处 《水利水电技术》 CSCD 北大核心 2011年第5期68-70,共3页 Water Resources and Hydropower Engineering
关键词 观音岩水电站 碾压混凝土 斜层 坡脚处理 经济性 Guanyinyan Hydropower Station roller-compacted concrete inclined layer treatment on slope toe economy
  • 相关文献

参考文献4

  • 1张镜剑.碾压混凝土坝的历史、现状和趋势[J].华北水利水电学院学报,2000,21(3):1-7. 被引量:10
  • 2潘家铮 何王景.中国大坝50年[M].北京:中国水利水电出版社,2000..
  • 3王宏硕,段亚辉,等.国内外碾压混凝土筑坝技术的调查研究,国家八五科技攻关专题报告[R].武汉水利电力大学,1995.
  • 4DL5108-1999.混凝土重力坝设计规范[S].[S].,..

二级参考文献7

共引文献164

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部