摘要 本文介绍了锦屏二级水电站3#引水隧洞有盖重防渗固结灌浆试验的施工方法和试验参数。通过防渗固结灌浆试验,总结出在灌浆施工中应及时采集的相关信息和采取的施工工艺,既保证了施工质量又保证了施工速度。 The construction method and parameters of the cover-weight anti-seepage consolidation grouting for No. 3 water diversion tunnel of Jinping Hydropower Station II are described herein. Through the experiment of the anti-seepage consolidation grouting, the relevant information to be obtained and the related construction technologies to be taken during the construction are sum- marized, and then both the quality and the speed of the construction are actually ensured as well.
出处 《水利水电技术》 CSCD 北大核心 2011年第5期97-99,共3页 Water Resources and Hydropower Engineering
关键词 锦屏二级水电站 引水隧洞 防渗固结灌浆 工艺及参数 质量评价 Jinping Hydropower Station II water diversion tunnel anti-seepage eonsolictation grouting technology and parameter quality evaluation
  • 相关文献

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部