期刊文献+

合成氨生产中氧含量控制系统的改进 被引量:1

Advanced oxygen control system for production of synthetic ammonia
下载PDF
导出
摘要 介绍了合成氨生产中氧含量控制的一种控制方案。氧含量控制系统是一个大时滞系统,大时滞系统的控制问题是过程控制中的难题,本方案采取转移取样点位置的方法来解决这一难题,把合成氨生产中氧含量的取样点移至洗气塔气体出口。改进后时滞在5 s以内,有效地解决了氧含量监测控制的时滞过长的问题。 A control system for the oxygen control in the production of synthetic ammonia is introduced. Oxygen control system is a large-scale-time-delay system which is quite difficult to be controlled. Transferring the position of sampling points to the outlet of the scrubber tower is used to control the oxygen content in the production of synthetic ammonia in this paper. The time delay of the advanced oxygen control system is less than 5 seconds ,which can effectively control the oxygen content and solve the problems related to the large time delay.
出处 《现代化工》 CAS CSCD 北大核心 2011年第5期86-87,96,共3页 Modern Chemical Industry
基金 枣庄市安全检查监管专项(F122009-001-0067)
关键词 合成氨 氧含量 大时滞系统 安全 自动控制 synthetic ammonia oxygen content large-time-delay system safety automatic control
  • 相关文献

参考文献16

二级参考文献21

  • 1蔡风英.化工安全工程[M].北京:科学出版社,2001..
  • 2Max Appk Modem ammonia technology:Where have we got to,Where are we going[J].Nitrogen,,199:46—52.
  • 3Hua-Zhang Liu,Xiao-Nian Li,Zhang-Neng Hu Development of novel low temperature and low pressure ammonia synthesis catalyst[J].Volume:142,Issue:2,1996,209—222.
  • 4胡士信.阴极保护工程手册[M].北京:化学工业出版社,2002.248.
  • 5舒迪前.预测控制系统及其应用[M].北京:机械工业出版社,1998..
  • 6Zhang W D,Sun Y X,Xu X M.Two degree-of-freedom smith pretictor for process with time delay[J]. Automatica,1998,34(10):1 279-1 282.
  • 7Chu Y T,Wu W T.On modeling error characterization of multiple dead times system[J]. IEEE Tranaction on Automatic control,1986,31(2):157-159.
  • 8邵裕森,巴筱云.过程控制系统及仪表[M].北京:机械工业出版社,1998.206-213.
  • 9蒋德军.氨合成工艺技术的现状和发展[J].大氮肥,1997,20(5):297-300. 被引量:15
  • 10亢万忠,蒋德军.节能型天然气制氨工艺的能耗组成及其剖析[J].大氮肥,1997,20(6):372-376. 被引量:7

共引文献96

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部