摘要
以新疆华能克拉玛依热电联产工程为研究对象,通过历史实测资料及近期实地调查资料,进行洪水影响评价分析计算,结合小流域设计洪水及蓄洪区洪水位分析计算结果综合评价非防洪建设项目对防洪可能产生的影响和洪水对非防洪建设项目可能产生的影响,并提出评价意见和防御措施。
In this paper,Huaneng Xinjiang Karamay Cogeneration Project as the object of research,measured by historical data and recent field data and calculation of flood impact assessment analysis,combining small watershed flood storage area design flood and flood level of calculation results of comprehensive evaluation of non-flood control construction projects the possible impact on flood control and flood control projects of non-flood potential impact,and evaluations are made and preventive measures are taken.
出处
《中国农村水利水电》
北大核心
2011年第5期149-152,155,共5页
China Rural Water and Hydropower