期刊文献+

关于非防洪建设项目洪水影响评价——以华能克拉玛依热电联产工程为例 被引量:1

Non-flood Control Projects on the Impact Evaluation Analysis of Flood;Using Huaneng Karamay Cogeneration Project as an Example
下载PDF
导出
摘要 以新疆华能克拉玛依热电联产工程为研究对象,通过历史实测资料及近期实地调查资料,进行洪水影响评价分析计算,结合小流域设计洪水及蓄洪区洪水位分析计算结果综合评价非防洪建设项目对防洪可能产生的影响和洪水对非防洪建设项目可能产生的影响,并提出评价意见和防御措施。 In this paper,Huaneng Xinjiang Karamay Cogeneration Project as the object of research,measured by historical data and recent field data and calculation of flood impact assessment analysis,combining small watershed flood storage area design flood and flood level of calculation results of comprehensive evaluation of non-flood control construction projects the possible impact on flood control and flood control projects of non-flood potential impact,and evaluations are made and preventive measures are taken.
出处 《中国农村水利水电》 北大核心 2011年第5期149-152,155,共5页 China Rural Water and Hydropower
关键词 非防洪建设项目 洪水影响 水位 评价 non-flood control projects floods water evaluation
  • 相关文献

参考文献6

  • 11998-01-01,中华人民共和国防洪法[S].
  • 2.中华人民共和国水法[s].,2002..
  • 3中华人民共和国河道管理条例[S].(国务院1988年).
  • 4水政[1992]7号,河道管理范围内建设项目管理的有关规定[Z].1992.
  • 5张卫东.华能克拉玛依热电一期(2×350Mw级)工程可行性研究报告[R].乌鲁木齐:新疆电力设计院,2009.
  • 6SL189-96.小型水利水电工程碾压式土石坝设计导则[S].[S].,..

共引文献29

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部