期刊文献+

城市污水的低氧短程脱氮中试研究 被引量:4

Pilot Study on Shortcut Nitrogen Removal from Municipal Wastewater under Low Oxygen Concentration Condition
原文传递
导出
摘要 采用中试A2/O系统处理实际城市污水,考察了在低氧条件下实现短程脱氮的可行性。结果表明,当缺氧池DO从1.0 mg/L降到0.2 mg/L,好氧池DO从2.5 mg/L降到1.0 mg/L时,系统的脱氮效果显著提高,对TN的去除率从(34.96±4.91)%上升到(71.44±13.45)%,污泥浓度(MLSS)从1 800 mg/L上升到2 100 mg/L。当控制好氧池的DO在1.0 mg/L左右时,出水中发生了亚硝酸盐积累现象,从而证实了在低氧条件下利用连续流活性污泥法实现短程脱氮的可行性,在降低系统曝气能耗的情况下还提高了系统的脱氮效率。但当DO浓度降低时,污泥沉降性能将有所变差,污泥体积指数(SVI)从150 mL/g上升到300 mL/g左右。 The feasibility of shortcut nitrogen removal at low oxygen was investigated in a pilot- scale A2/O system for treating municipal wastewater. The experimental results show that when DO concentration in anoxic tank is decreased from 1.0 mg/L to 0.2 mg/L and DO concentration in aerobic tank is decreased from 2.5 mg/L to 1.0 mg/L, the removal rate of total nitrogen is increased dramatically from (34.96±4.91)% to (71.44±13.45)%, and MLSS is increased from 1 800 mg/L to 2 100 mg/L. Nitrite accumulation occurs when DO in aerobic tank is controlled at about 1.0 mg/L. These resuits verify that it is feasible to achieve shortcut nitrogen removal in the continuous-flow activated sludge process, and the nitrogen removal efficiency can be improved while reducing energy consumption for aera- tion. However, the sludge volume index (SVI) is increased from 150 mL/g to 300 mL/g when DO con-centration is decreased, indicating that sludge settleability becomes worse.
出处 《中国给水排水》 CAS CSCD 北大核心 2011年第11期9-13,共5页 China Water & Wastewater
基金 国家自然科学基金资助项目(50908164) 国家科技支撑计划课题(2006BAJ04A07) 教育部留学回国人员科研启动基金资助项目(20091508) 上海市建委重大科研项目(2007-008) 上海市科技人才计划项目(09XD1404100)
关键词 短程脱氮 溶解氧 A2/O工艺 城市污水 shortcut nitrogen removal dissolved oxygen A2/O process municipalwastewater
  • 相关文献

参考文献9

二级参考文献67

  • 1国家环境保护局《水和废水监测分析方法》编委会.水和废水监测分析方法(第4版)[M].北京:中国环境科学出版社,2002..
  • 2国家环保总局.水和废水监测分析方法[M](第3版)[M].北京:中国环境科学出版社,1989.280.
  • 3Abeling U,Seyfried C F.1992.Anaerobic-aerobic treatment of high strength ammonia wastewater nitrogen removal via nitrite[J].Wat Sci Tech,26:1007-1015
  • 4Balmelle B,Nguyen M,Capdeville B,et al.1992.Study of factors controlling nitrite build-up in biological processes for water nitrification[J].Wat Sci Tech,26(5-6):1017-1025
  • 5Ceceng F,Goneng I E.1994.Nitrogen removal characteristics of nitrification and denitrification filters[J].Wat Sci Tech,29 (10-11),409-416
  • 6Ciudad G,Rubilar O,Munoz P,et al.2005.Partial nitrification of high ammonia concentration wastewater as a part of a shortcut biological nitrogen removal process[J].Process Biochemistry,40:1715-1719
  • 7Daniel S,Hagopian,John G.1998.A closer look at the bacteriology of nitrification[J].Aquacultural Engineering,18:223-244
  • 8Gao J F,2001.The fundamental study of fuzzy control on organic and nutrient removal in SBR[D].Harbin:Harbin Institute of Technology,193-194(in Chinese)
  • 9Hellinga C,Schellen A A J C,Mulder J W,et al.1998.The SHARON process:an innovative method for nitrogen removal from ammoniarich wastewater[J].Wat Sci Tech,37(9):135-142
  • 10Mauret M,Paul E,Puech-Costes E,et al.1996.Application of experimental research methodology to the study of nitrification in mixed culture[J].Wat Sci Tech,34(1-2):245-252

共引文献135

同被引文献40

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部