期刊文献+

连续非线性系统预测控制的次优性分析 被引量:3

THE SUBOPTIMALITY ANALYSIS OF PREDICTIVE CONTROL FOR CONTINUOUS NONLINEAR SYSTEMS
下载PDF
导出
摘要 针对一般连续非线性系统,研究了有终端约束的稳定预测控制策略相对传统最优控制的次优性问题.通过分析预测控制的有限时域滚动优化性质,得到了预测控制次优性的上界,并且将该结果应用于连续线性系统,得到了一个量化的次优性评价指标. Considering the general continuous nonlinear systems,the suboptimality of stable predictive control with terminal constraints is studied and compared with the traditional optimal control.By analyzing the property of receding finite\|horizon optimization,the upper bound of suboptimality is obtained.The result is applied to linear systems,and a suboptimality quantized index is proposed.
出处 《自动化学报》 EI CSCD 北大核心 1999年第5期673-676,共4页 Acta Automatica Sinica
基金 国家自然科学基金
关键词 预测控制 最优控制 连续非线性系统 Receding horizon control, predictive control,optimal control,suboptimality,continuous nonlinear system.
  • 相关文献

同被引文献12

  • 1唐功友,王海红.离散线性时滞系统的次优控制:逐次逼近法[J].自动化学报,2005,31(3):419-426. 被引量:13
  • 2Ovacik I M, Uzsoy R. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup-times[J]. International Journal of Production Research, 1994, 32(6): 1243-1263.
  • 3Singer Marcos. Decomposition methods for large job shops[J]. Computers & Operations Research, 2001, 28(3) : 193-207.
  • 4Chand S, Traub R, Uzsoy R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates[J]. Annals of Operations Research, 1997, 70: 115-125.
  • 5Ovacik I M, Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times[J].International Journal of Production Research, 1995, 33: 3171-3192.
  • 6Fang J, Xi Y G. Rolling Horizon job shop rescheduling strategy in the dynamic environment[J]. International Journal of Advanced Manufacturing Technology, 1997, 13(3) : 227-232.
  • 7Mayne D Q, Michalska H. Receding horizon control of nonlinear systems[J]. IEEE Trans. Automat Contr., 1990, 35(7) : 814-824.
  • 8Dessouky M I, Deogun J S. Sequencing jobs with unequal ready thnes to minimize mean flow time[J]. SIAM Journal on Computing,1981, 10(1): 192-202.
  • 9Chu Chengbin. Efficient heuristics to minimize total flow time with release dates[J]. Operations Research Letters, 1992, 12:321-330.
  • 10席裕庚.动态不确定环境下广义控制问题的预测控制[J].控制理论与应用,2000,17(5):665-670. 被引量:71

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部