期刊文献+

中国现阶段总承包工程交易模式决策属性研究 被引量:8

Decision-making attributes of lump-sum contracting project delivery methods of China at present
下载PDF
导出
摘要 通过文献研究总结出的38个总承包成功交易模式决策的重要属性,并从中选出20个作为我国总承包工程交易模式决策的初选属性集;运用Mean Score和Ranking Agreement Factor模型对总承包工程交易模式决策初选属性重要性的市场调查数据进行排序计算和一致性分析.结果显示,来自业主工程技术能力、业主工程建设偏好、项目性质与总承包市场条件4个方面的17项属性对我国总承包工程交易模式决策产生重要影响.最后提出了促进我国建筑业工程总承包制度快速健康发展的对策和建议. 20 factors are selected to frame a primary factor set from 38 factors obtained though literature study.The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data.The results show that 17 factors about owner's engineering capabilities,owner's preferences to project construction,project properties,and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods.Finally,countermeasures and suggestions are proposed to promote the rapid and sound development of lump-sum contracting system in the construction industry of China.
作者 王学通
机构地区 广州大学商学院
出处 《西安建筑科技大学学报(自然科学版)》 CSCD 北大核心 2011年第2期253-259,共7页 Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
基金 国家科技支撑计划资助项目(2006BAJ03A10)
关键词 工程总承包 工程交易模式 决策属性 lump-sum contracting project delivery methods decision-making attributes
  • 相关文献

参考文献12

  • 1Bennett J,Pothecary E,Robinso G.Designing and Building a World-Class Industry.Center for Strategic Studies in Construction[R].Reading,UK,1996.
  • 2Beard J,Loulakis M,Wundram EC.Design-Build:Planning through Development[R].Mcgraw-Hill,2001.
  • 3Pinnacleone Pulse.Public Owners Use Alternative Delivery Methods Construction Bulletin[R].Reed Business Information,US,Division of Reed Elsevier Inc,2005.
  • 4Laedre O,Austeng K,Haugen TI,Klakegg OJ.Procurement Routes in Public Building and Construction Projects[J].Journal of Construction Engineering and Management,ASCE,2006,132(7):689-696.
  • 5Eaves WM,Laubach PB.Managing Hospital Design and Construction Programs[R].The Foundation of the American College of Healthcare Executives,Chicago,1987:73-81.
  • 6Gordon CM.Choosing Appropriate Construction Contracting Method[J].Journal of Construction Engineering and Management,ASCE,1994,120(1):196-210.
  • 7Uhlik FT,Eller MD.Alternative Delivery Approaches for Military Medical Construction Projects[J].Journal of Architecture Engineering,1999,5(4):149-155.
  • 8Hashim M,Chan MYL,Ng CY,et al.Factors Influencing the Selection of Procurement Systems by Clients[C] //International Conference on Construction Industry,Padang,Indonesia,2006.
  • 9Ratnasabapathy S,Rameezdeen R,Lebbe NA.Exploratory Study of External Environmental Factors Influencing the Procurement Selection in Construction[J].Journal of Construction Engineering and Management,ASCE,2004,130(1):153-155.
  • 10Lo TY,Fung IWH,Tung KCF.Construction Delays in Hong Kong Civil Engineering Projects[J].Journal of Construction Engineering and Management,ASCE,2006,132(6):636-649.

同被引文献79

引证文献8

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部