摘要 宽箱组合梁的混凝土桥面板宽度很大,桥梁施工过程复杂,结构不满足平截面假定,用梁理论难以分析结构的受力。利用ANSYS有限元程序建立宽箱组合梁的板壳和实体模型,采用荷载增量步骤技术和单元生死技术,实现桥梁从施工到成桥全过程的受力仿真分析。结合某一五跨连续组合箱梁桥,根据施工顺序详细介绍对其仿真分析的方法。计算结果表明,该方法能够十分精确地模拟构件实际受力全过程,为多跨组合梁桥施工方案的选取提供了一种有效的验证手段。 The analysis of mechanical behavior of wide box composite girder is difficult by beam-column theory,for the width of concrete deck is very large and the construction processes are complicate,furthermore the structure is not agree with plane cross-section assumption.Shell and solid model of wide box composite girder was developed by ANSYS finite element program.Simulation analysis of bridge behavior was performed from its construction state to complete state by adopting the techniques of loading increment step and element birth/death technology.Combining a five spans composite box-girder continuous bridge,the simulation analysis method is introduced in detail based on its construction sequences.The results show that this method can be used to calculate member stress and deformation in its full construction procedures efficiently,and it is an effective method to test the construction scheme of continuous composite bridge.
出处 《结构工程师》 2011年第2期78-83,共6页 Structural Engineers
基金 浙江省科技计划项目(2009C11102) 国家科技支撑计划项目(2009BAG15B02)
关键词 组合梁 有限元 仿真分析 连续梁桥 composite girder finite element simulation analysis continuous girder bridge
  • 相关文献

参考文献8

  • 1Chiewanichakorn, Methee. Effective flange width definition for steel-concrete composite bridge girder [ J ]. Journal of Structural Engineering, 2004, 130 (12) :2016-2031.
  • 2Ryu, Hyung-Keun. Ultimate strength of continuous composite box-girder bridges with precast decks [ J ]. Journal of Constructional Steel Research, 2005, 61 (3) :329-343.
  • 3Branco, Fernando A. Composite box girder bridge behavior during construction [ J ]. Jourual of Structural Engineering, 1985,111 ( 3 ) : 577-593.
  • 4Kwak, Hyo-Gyoung. Effects of the slab casting sequences and the drying shrinkage of concrete slabs on the short-term and long-term behavior of composite steel box girder bridges. Part 1 [ J ]. Engineering Structures,2000,22 ( 11 ) : 1453-1466.
  • 5Kwak, Hyo-Gyoung. Effects of the slab casting sequences and the drying shrinkage of concrete slabs on the short-term and long-tern, behavior of composite steel box girder bridges. Part 2 [ J ]. Engineering Structures ,2000,22 ( 11 ) : 1467-1480.
  • 6孙斌,肖汝诚.基于ANSYS的桥梁几何非线性活载效应分析[J].结构工程师,2010,26(2):51-56. 被引量:6
  • 7徐海军,冷金荣.城市高架桥异形宽箱梁空间结构分析[J].结构工程师,2010,26(2):70-75. 被引量:18
  • 8邵长宇.九堡大桥组合结构桥梁的技术构思与特色[J].桥梁建设,2009,39(6):42-45. 被引量:66

二级参考文献7

共引文献87

同被引文献41

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部