泸定水电站引水洞工程是目前国内在建的开挖断面最大、地质条件最为复杂的地下洞室之一,在2号引水洞开挖至K0+401.5处时,由于顶拱位置受陡倾角、大断层等地质因素影响出现塌方。为此,主要介绍对塌方影响区采取的加固措施及塌方段的处理方法。
The diversion tunnel of Luding Hydropower Station is one of underground caverns under construction currently in China with extra-large excavation section and most complex geological conditions. The rock slide happens in the location of K0 +401.5 m in the excavation of No. 2 diversion tunnel due to the steep dip and large fault in the location of arch crown. The treatment to the rock slide area and the reinforcement to the slide-affected zones are introduced herein.
出处
《水力发电》
北大核心
2011年第5期48-50,53,共4页
Water Power
关键词
特大断面
变形加固
塌方处理
引水洞
泸定水电站
extra-large cross section
deformation reinforcement
rock slide treatment
diversion tunnel
Luding Hydropower Station