期刊文献+

泸定水电站厂房清水混凝土施工技术 被引量:4

Construction Technology of As-cast Finish Concrete for the Powerhouse of Luding Hydropower Station
下载PDF
导出
摘要 结合泸定水电站厂房清水混凝土施工,分析了饰面清水混凝土的质量控制标准、原材料及半成品的质量控制和模板施工工艺,从外观色差、平整度、分缝、棱角等方面总结了施工工艺及控制措施。最终泸定水电站清水混凝土色泽一致、表面洁净光泽、棱角方正,获得各方好评。 Taking the as-cast finish concrete construction for the powerhouse in Luding Hydropower Station as an example, the quality controls on as-cast finish concretes, raw materials and semi-finished products and the formwork construction are analyzed, and the construction technologies and controls are summarized from the color, smoothness, joints and corners. The final quality examination for the powerhouse as-cast finish concrete shows that the color is uniform, the surface is clean and flat, and the edges and corners are square-shaped.
出处 《水力发电》 北大核心 2011年第5期59-62,共4页 Water Power
关键词 饰面清水混凝土:原材料控制 施工工艺 缺陷控制措施 泸定水电站 surface as-cast finish concrete raw material control construction technology defect control Luding HydropowerStation
  • 相关文献

参考文献5

  • 1JGJ160-2009 清水混凝土应用技术规程[S].
  • 2DL/T5144-2001.水工混凝土施工规范[S].[S].,..
  • 3DL/T 5169-2002,水工混凝土钢筋施工规范[S].
  • 4DL/T5110-2000.水利水电工程模板施工规范[S].[S].,..
  • 5SL52-1993 水利水电施工测量规范[S].

共引文献202

同被引文献9

引证文献4

二级引证文献10